We had the first Breakfast Builders Work Day of 2010 on Saturday, March 27th. We started the morning off with a great hot breakfast of breakfast burritos and homemade cinamon rolls. Though the weather pretty much knocked us off a few outdoor projects we were able to do three jobs:
  • We sent a team of 5 to install laminate flooring in a hallway and two bedrooms in a mobile home in Lafayette. Though they had to stay a couple of hours past noon in order to finish, they did an incredible job! Check out the photos below.
  • Another group of people went to another mobile home in the same neighborhood. That job involved an assessment of several projects we hope to work on in the near future. Due to heavy rains and no rain gutters, a lot of water has saturated the ground under the home which has caused some places to drop. Low spots were identified by using a water tube leveling device, and the anchoring pillars underneath the home were marked and identified. In the next few months after the ground has dried and gutters and an awning are installed, we can level the trailers.
  • A two-man team of plumbing specialists replaced and repaired a sill cock valve at a home in Lafayette. In addition to that they cut out and replaced a piece of water damaged sheetrock from the leaky valve.

Stu, Marcia, Rick, Brian
Brian sizing up the room
Finished product












No comments:

Post a Comment